Home > Projects

Successful Projects

More than 1,200 projects completed throughout Mexico. Discover how we design, build, and operate water infrastructure with the highest level of industrial reliability.

State
Industry
Type of Treatment
Years
Technology
RECENT SUCCESS STORIES

Infrastructure in Operation

Automotive
Guadalajara, Jal.

BIM Modeling for an Industrial Plant

Client: Automotive | Conceptual and Detailed Engineering

View Project
Builders
Baja California

Treatment and Automation Systems

Client: Sierra Aluminum | Softened water, 35 gpm reverse osmosis, and cell drainage

View Project
Pharmaceutical
Baja California

Pharmaceutical-Grade Reverse Osmosis

Client: Medtronic | 40 gpm, USP, FDA, and COFEPRIS approved

View Project
Hotels
Los Cabos, B.C.S.

The Point Wastewater Treatment Plant and Desalination Plant – Hyatt

Cliente: Hyatt | Tratamiento 400 m³/d + desalinización de agua de mar

View Project
Water Treatment
Guerrero y Oaxaca

Water Treatment for Rural Wells

Client: Guerrero/Oaxaca State Government | Electrocoagulation-Ultrafiltration, 12–24 m³/hr

View Project
Maquiladora
Tijuana, B.C.

Aerospace Complex PTAR

Client: Grupo Aeroespacial del Norte. Tijuana, B.C. | MBBR + DAF Flotation, 12–24 m³/hr

View Project

Aerospace Complex PTAR

Case Study of the Ultrafiltration and Reuse System Implemented in Northern Mexico.

General Description

A wastewater treatment plant using Membrane Bioreactor (MBR) and Reverse Osmosis technology was designed and installed for a major aerospace company in Tijuana. The plant enables the recycling of 90% of the process water for reuse in cooling towers and general services.

Development Gallery (Before / After)

Phase 1: Civil and Hydraulic Engineering
Phase 2: Plant Completed and Operational
OPERATIONAL CAPACITY
150 m³/día
YEAR OF DELIVERY
2024

Implemented Technology

MBR Membrane Reactors
Multimedia Activated Carbon Filters
Precision Chemical Dosing Systems
Full Automation via PLC & SCADA
“Thanks to IQEA's conceptual engineering and reverse osmosis technologies, we achieved our goal of zero pollutant discharges into the adjacent river and recovered nearly all of the flow for the plant's cooling towers.”
Ing. Francisco Delgado
Infrastructure Manager —
Bajío Processing Plant
40+

Completed Projects

8

States Served

10+

Target Industries

99%

Satisfied Customers

Do you have a project in mind?

Our specialist engineers are ready to analyze your project, conduct site visits, and design an optimal solution tailored to your technical requirements.

Asesoría en línea